Report

Crosstown Freeway

As delineated by the Fresno County Transportation Authority, there does not exist any effective means of transportation to travel from North East to North West portions of Fresno and Clovis. The new Crosstown Freeway will extend from State Route 99 at Avenue 9 in Madera to State Route 168 on Shepherd Avenue in Clovis. In addition, the design accommodates residents of Fresno and Madera County by providing an interchange at Avenue 9 and Access Road 35, an overcrossing for Avenue 9 at Road 35, an overhead structure for Avenue 9 at High Speed Rail, an overhead structure for the Burlington Northern Santa Fe Rail, geotechnical developments for the respective structures, and stormwater and hydrology analysis for the designated locations.

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.